DC Mont MPPT Installation Guide

Modified on Wed, 13 Sep, 2023 at 10:23 PM

Choose a mounting location on a vertical surface that should be protected from direct sunlight,

high temperatures, and water. Make sure there is good ventilation.


Verify that there is sufficient room to run wires, as well as clearance above and below the controller

for ventilation. The clearance should be at least 6 inches (150mm).

Secure the controller on the mounting location.


Switch off the air switch or fuse of the battery, solar panel and load.

Connect the battery to the battery terminals on the controller.

Connect the solar panel to the solar panel terminals on the controller.

Connect the load to the load terminals on the controller.

Switch on the fuse of the battery first, then the air switch of the solar panel, and finally the fuse of the load.



Do you have more concerns or want to know more about our products? Visit our Customer Support Page, or call (02) 5761 0297 for quick assistance.



Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article